-
November 2025
- News
Solar PV for business: the complete guide for the entrepreneur
Photovoltaic for businesses: a practical guide for SMEs on ROI, incentives, and self-consumption. Reduce energy costs and plan budgets with greater stability.
-
October 2025
- News
Industrial solar repowering: the guide to increasing capacity for large plants
Has your energy demand grown? A strategic guide to repowering industrial photovoltaic systems: business case, technical aspects, bureaucracy, and ROI.
-
September 2025
- News
New ARERA resolution for PV plants P ≥100 kW
Mandatory installation of the Central Plant Controller (CCI) for all photovoltaic systems with a capacity equal to or greater than 100 kW connected at MV.